Leave the Daytime Sun for the Night, on the Coast of Costa Rica

Created on:2026-11-19

Two 55 kW inverters, 240 pieces of 630 W modules, one 215 kWh battery. On paper, only three lines of figures. On the ground, it is a whole different story.

 
I. 6:20 in the Evening
 

PV Module Installation Photos

A dozen kilometers inland from Costa Rica’s Pacific coast lies an integrated agricultural and livestock park. Sheds, cold storage rooms, sorting workshops and a small office building surround an open lot, once empty.

At 6:20 that evening, the sorting line was wrapping up its last batch of goods for the day. The lights flickered, the conveyor belt halted, fault indicators lit up on the control cabinet, and the frequency converter reported an overvoltage fault. Cold storage compressors shut down accordingly. The on-duty staff rushed to check the temperature, which rose by more than two degrees Celsius within seven minutes. Fortunately, the cargo could withstand the fluctuation.

The park management later told us this kind of incident occurred two to three times a month. When voltage sag happens, the first equipment to malfunction are not motors, but devices with switching power supplies: sorting control cabinets, temperature controllers, monitoring hosts and communication modules. They do not burn out; they reboot, trigger alarms, and stop operation unexpectedly.

Their requirement was straightforward: stop unplanned shutdowns of critical equipment. Daytime sunlight powers the park directly, with surplus energy stored for later use. Operational load drops at night, with only essential machinery running. On cloudy and rainy days, the battery covers the power shortfall.

II. The Load Profile: A Curve with Two Faces

To understand this solution, we must first examine the park’s distinctive load pattern.

Daytime is the working period. Sorting, water supply, shed ventilation, cold storage cooling, monitoring and lighting run simultaneously, with the overall park load ranging from 30 kW to 50 kW and peaking around noon. During this window, PV generation is prioritized for on-site consumption, and excess power charges the battery.

After 6 p.m., activities wind down. Sorting lines and water pumps stop, lights in the canteen and dormitories are turned off one by one. Only a few loads must remain operational round the clock: cold storage temperature maintenance, continuous shed ventilation, monitoring and communication systems, plus essential lighting. These form a base load of 20–30 kW, low in magnitude yet non-stop through the night.

Rainy days present another scenario. Thick cloud cover suppresses PV output, which becomes intermittent. Available solar power first serves daytime loads, and any gap is filled by the battery. If rainy weather persists and battery reserves deplete, the utility grid provides backup.

The core conflict lies in mismatched rhythms: PV output follows sunlight, while the park load is high by day and low by night. Compounding this are chronic issues with the local low-voltage distribution network: lengthy lines shared by multiple consumers, leading to terminal voltage sags during peak hours. Short voltage dips or outages occur several times a month in thunderstorm seasons, and coastal salt corrosion erodes cable joints and enclosures.

Four core objectives were defined for the solution: prioritize on-site PV self-consumption in daytime; store surplus electricity in the battery; support essential night-time base load; and deploy battery power during grid instability or insufficient solar generation.

 
III. Energy Hub: Two Core Components
 

The full PV energy storage system operates through the coordination of hybrid energy storage inverters and lithium iron phosphate battery cabinets. The two units have clear division of responsibilities to complete light-to-electricity conversion, power dispatch and backup power supply.

System Schematic Diagram

Energy Storage Inverters

55 kW Split-Phase Hybrid Grid-Tied Energy Storage Inverters

Two 55 kW hybrid energy storage inverters adopt an AC parallel configuration. Their battery DC sides are not connected in series for voltage boosting. Both inverters share identical battery voltage specifications, delivering a total AC output capacity of 110 kW as the dispatch core of the system. PV power is supplied to on-site loads first. Excess generation charges the battery; when sunlight is insufficient or the grid fails, stored battery power is discharged.

Each unit is equipped with 10 independent MPPT channels with a PV tracking voltage range of 180–550 V. The battery-side operating voltage window is 650 V–880 V, and the maximum input current per MPPT channel is 32 A. This North American standard three-phase hybrid inverter supports 220 V three-phase output, as well as 110 V and 220 V single-phase output. It reaches a peak efficiency of 98.2% and achieves seamless grid-tied/off-grid switching within 16.6 ms to guarantee uninterrupted operation of critical loads. Complete protection functions are integrated. With IP66 rating and air cooling, it supports multi-protocol communication and adapts to the coastal high-temperature and high-humidity environment.

Parallel Operation Note: AC synchronous parallel connection expands power capacity without raising the battery DC voltage. The two identical inverters share matching battery voltage windows and compatible operating conditions.

Lithium Iron Phosphate Energy Storage Cabinet

215 kWh Energy Storage Battery Cabinet

The 215 kWh lithium iron phosphate cabinet uses 280 Ah cells in a 240S1P configuration. Each cell has a nominal voltage of 3.2 V, giving a rated battery voltage of 768 V. The BMS sets the operating range at 672 V–864 V, supporting 0.5C charge and discharge with a maximum discharge depth of 98%.

✅ Voltage Matching Verification Result: The battery operating range of 672–864 V falls within the inverter’s allowable battery-side window of 650–880 V. The maximum full-charge voltage of 864 V does not exceed the inverter upper limit, and the discharge cut-off voltage of 672 V stays above the inverter minimum start voltage. Voltage compatibility is qualified. Both inverters satisfy the voltage matching requirement for this battery. Liquid cooling is adopted inside the battery compartment to reduce cell temperature difference and slow capacity degradation. A layered fire protection design provides sufficient safety redundancy. The noise level at full power is 75 dB, so the cabinet should be sited away from living quarters.

It stores surplus PV power after daytime self-consumption, compensates power shortages on cloudy days, sustains night-time base load, and acts as emergency backup during grid outages. The battery’s duty cycle is moderate yet demanding for stability: store excess solar energy by day, support the 20–30 kW essential base load overnight, fill PV gaps on rainy days, and back up priority loads in blackouts. With 90% usable capacity, the 215 kWh battery can sustain the 20+ kW night base load for 6 to 8 hours, with remaining demand covered by the grid. The 0.5C rate avoids aggressive discharge, benefiting cell temperature control and service life.

 
IV. 240 Modules Arranged in 20 Strings
 

This solution deploys two 55 kW three-phase hybrid energy storage inverters paired with 630 W N-type TOPCon bifacial double-glass PV modules, totalling 240 pieces. After high and low temperature boundary voltage verification, each string is designed with 10 modules, forming 24 strings in total. The two inverters share the strings equally, with each unit connected to 12 independent MPPT channels. One MPPT channel corresponds to one string, and no parallel connection of strings is applied.

The open-circuit voltage of a single string under standard test conditions is 557.2 V. The maximum open-circuit voltage at extreme low temperature reaches 604.0 V, below the inverter PV-side open-circuit protection threshold of 630 V, eliminating the risk of overvoltage in cold conditions. The operating voltage stays within the 180–550 V MPPT tracking range. The operating current per string is 13.66 A, leaving ample safety margin against the 32 A upper current limit per MPPT channel.

The total DC installed capacity is 151.2 kWp, matched with a total rated AC capacity of 110 kW, giving an AC/DC ratio of approximately 1.37. This oversizing design suits the local cloudy solar regime and improves weak-light generation yield. The inverter automatically clips power during midday strong irradiance, a pre-planned design trade-off. The modules are rated for 1500 V system voltage, compatible with this design.

System Operation Principle Video

 
V. How It Works on a Sunny Day and a Rainy Day
 

At 6 a.m., the modules remain cool with elevated open-circuit voltage, so the system starts later. Output ramps up shortly after 7 a.m.

Morning to noon is the prime window for self-consumption. PV power first feeds daytime loads including shed ventilation, cold storage cooling, monitoring and lighting. When generation exceeds real-time consumption, surplus power charges the battery, with charging power capped below 100 kW to prevent overheating of the cabinet.

Clouds roll in in the afternoon and PV output drops. The battery kicks in to compensate and stabilizes the busbar voltage. This coordination justifies the robust DC design: not merely to boost string yield, but to ensure the park operates transparently through 20-minute cloud transients.

Work activities wrap up in the evening, high-power loads shut down sequentially, leaving only cold storage, ventilation, monitoring and essential lighting. The battery carries the 20–30 kW base load and gradually discharges through the midnight hours. The grid supplements any shortfall once stored energy is depleted.

During prolonged rainy spells, PV output is intermittent. Daytime loads consume whatever solar power is available first, with gaps covered by the battery. Once the battery is nearly exhausted, the grid takes over. The system switches between these operating modes autonomously without manual adjustment.

When grid failure occurs, switching completes within around 16.6 ms. On site, the sorting control cabinet stops triggering alarms, cold storage compressors do not restart, and the monitoring feed remains uninterrupted.

Key PV Equipment Indoor Installation Photos

 
VI. Limitations of the System
 

The AC/DC ratio stands at 1.37. In rainy seasons with abundant sunlight, midday power clipping will occur, resulting in partial generation loss, a trade-off evaluated in the early design phase.

Strings are configured at 10 modules per string with sufficient voltage safety margin. Nevertheless, separate open-circuit voltage review is recommended under extreme cold snaps combined with module parameter deviation. One-string-per-channel layout is adopted without string paralleling to avoid uneven current risks.

The cabinet’s standard anti-corrosion grade is C3. Reliability relies on proper siting and regular maintenance. For locations exposed to heavy salt spray within 100 meters of the shoreline, upgrade to C5 anti-corrosion grade, which is mandatory.

The liquid-cooled energy storage cabinet derates when ambient temperature exceeds 35°C, reducing output capability in hot afternoons. The solution has been verified against the local load curve to satisfy basic power demand, though this characteristic remains inherent.

 
VII. Back to That Evening
 

Now when voltage sags happen, lights dim briefly then stabilize. Frequency converters no longer report overvoltage faults, and the cold storage temperature curve stays flat.

Park staff still tend to stop by the power distribution room at dusk. But now they watch the power curve on the screen instead of the voltmeter.

The coastal sun is nothing unusual, shining for more than 300 days a year. What makes the difference is this: it powers the daytime work first, and the surplus is reserved for the night and rainy days.