Working Principle Video of 500 kW / 1 MWh C&I PV-ESS

Created on:2026-11-06

This 500kW / 1MWh C&I PV‑ESS includes four 125kW grid‑tied inverters and four energy storage cabinets. Direct current from solar panels is inverted to AC for factory loads, while surplus power is stored. During peak consumption, the storage discharges together with the grid for peak shaving and stable power supply.